Traffic into Tuscaloosa was badly snarled Monday morning when a truck transporting an entire assembled storage shed dropped it on the Hugh Thomas Bridge.

Keith Carpenter, the assistant chief of the Northport Police Department, confirmed that they had traffic officers responding to a lost load in the bridge's southbound lanes leading from Northport into Tuscaloosa on Lurleen B. Wallace Boulevard.

Tuscaloosa Thread logo
Get our free mobile app

Traffic cameras show multiple lanes blocked by an entire, assembled storage shed in the middle of the road. Better than chicken parts, perhaps.

(ALGO Traffic Cameras)
(ALGO Traffic Cameras)
loading...

Carpenter did not have an estimated time for when the bridge might be clear again -- traffic is moving slowly in the one lane not closed by the incident.

If possible, motorists should avoid the area until the bridge can be cleared and lanes are reopened.

UPDATE, 1:30 P.M.: The shed has been removed from the bridge and traffic is flowing normally again.

 

Top Stories from the Tuscaloosa Thread (3/20 - 3/27)

12 of the Top Stories published by the Tuscaloosa Thread during the week of March 20th, 2023.

More From Tuscaloosa Thread